Initial Review of the
Project
The B&C Project Engineer
handling a project will promptly look-over the project documents and
specifications upon receipt to determine if anything new or unusual is
involved. Informal questions or comments will be discussed directly with the
cognizant customer Engineer and then is noted in the project records. An
essential function of this initial review is to determine whether or not all
necessary information is available to properly estimate or proceed with the
work. |
OC3 Fiber Management System
 |
|
ACI Rack System

|
Customer Relations
It is expected that the customer will gather and
forward to B&C data from third parties such as other railroads, regulatory
agencies, contractors, etc where need in connection with a specific job.
Verbal and written communications between the customer will generally be
handled by the B&C project engineer except when it is necessary to desirable
for the engineer(s) to directly communicate with the appropriate customer
representative. Note that the overall responsibility for the correct and
timely completion of the project remains vested with the B&C project
engineer.
|
|
Estimating
The B&C Project Engineer will
prepare estimates of engineering cost using agreed-upon norms for labor,
materials, overhead, etc. for all change orders and additional work. In the
event that an accurate estimate cannot be prepared with the information
at-hand, the B&C project manager will promptly advise the customer's
engineer as to the reasons why and what alternatives if any might be
considered. |
Video Recording System
 |
|
Specialized Power Supply

|
Typical and Standards
To the greatest extent possible, designs will be
based on templates derived from customer typicals and other applicable
standards. The project engineer working with the assistance of the design
team will develop these templates. new or revised templates will be
submitted to the customer for review.
Likewise, the customer will promptly advise B&C of
approved, desired, or anticipated changes in their standards. |
|
Design
Design work will commence once
notice to proceed has been received from the customer in accordance with an
agreed-upon set of priorities and deliverables schedules. Emergencies will
be handled at the project engineers discretion. Experienced persons under
the direct supervision of the B&C project engineer will perform design work
not performed by the project engineer him/herself. Routine questions
developed during the course of design work will first be referred to the
project engineer before they are presented to the customer.
The designer will consider all
aspects of the system including power consumption and distribution. |
Vital Net Ring System
 |