CURRENT PROJECTS
|
Completion Date |
Client
Name |
Project
Name |
Project
Description |
|
10/2007 |
NCTD |
San Diego Sprinter Project |
B&C is currently
designing, furnishing, and will startup and test all signal,
crossing and communications systems for the new 22.5 mile Sprinter
project from Oceanside to Escondido. The project includes Central
office System, 15 passenger stations, over 45 grade crossings and
tie-ins to existing freight and commuter rail facilities. Beyond
track and signal engineering, this project includes paging,
intercom, Visual messaging, backbone network equipment,
communication cabinets, emergency telephones, CCTV, and security
systems. |
|
5/1/06 |
SAC RT |
Train Consist Enhancement |
Modifications to GPS tracking system for development of train
consist interface and tracking by both trains and individual rail
cars. |
|
01/2007 |
SF MUNI |
3rd Street Extension |
Design,
furnish, startup and test wayside cases to control light rail
vehicles along the 3rd street extension. Furnish and install all
communications equipment for 18 passenger platforms including
head-end interface equipment. |
|
12/2006 |
VTA |
Warm
Springs Project |
Warm Springs to San
Jose Extension project. B&C is providing design services for the VTA/BART
extension for ATC and communications. |
|
12/2006 |
Alstom |
Blue Orange
Line |
B&C provided all field
personnel required to commission Blue-Orange line for Alstom
signaling. |
|
10/2005 |
ARINC |
RTU Project |
Los Angeles MTA. B&C
is currently designing and manufacturing 25 remote terminal units
that will replace existing out of date units. |
| 06/2005 |
SF MUNI |
Muni 3rd
Street |
Installation of over
21 miles of fiber optic cabling for the new 3rd street extension.
Complete SONET, CCTV, RISS, Emergency telephone in 18 stations so
that all services are monitored and controlled from new Muni
Maintenance Facility. |
|
04/2005 |
SF MUNI |
Drawbridge
Project |
Design, furnish,
startup, and test wayside cases to control freight rail, light rail
and drawbridge. |
|
04/2005 |
SF MUNI |
3rd Street
Extension Addition |
Design, furnish,
startup and test wayside cases to control light rail vehicles along
the 3rd street extension. Furnish and install all communications
equipment for 18 passenger platforms including head-end interface
equipment. |
|
03/2005 |
Chervon |
Technology
Center |
Design/build
installation of Cat 6 cabling, communications room build-out and
single mode fiber optic cabling throughout 28 building campus.
Upgrade of campus 10BaseT shared Gigabit Ethernet. Facility is the
only Petroleum research facility in the Western hemisphere. Project
requires team to install network around live petroleum experiments
where safety is the only concern. |
|
03/2005 |
SAC RT |
Switch
Control |
Provide programming
change to 3 on-site VHLC processors to send switch, gate, and signal
indications to the IT servers in the Sacramento Light Light control
center. Interface these functions into the new GPS tracking system
so operators can remotely control switches at those locations and
monitor the status of switches, gates, and signals. |
|
03/2005 |
|
Schools
Project |
Installation of Fire
alarm, clock speaker, voice and data, Fiber Optics, and security
systems for a number of Northern California school districts. |
|
02/2005 |
VTA |
Tamien
Project |
Tamien to Lick Double
Track Project. Provide all modifications to existing control points,
startup and test new control point locations and furnish wayside
equipment for CalTrain/UPRR. |
|
02/2005 |
WMATA |
AVI Locator
Project |
Automatic Car
Identification (ACI) - provide design, installation and testing for
50 RF scanners at 23 locations throughout the metro system. Twenty
of these locations will utilize wireless radio communications to
relay data from the wayside back to OCC (operations control center).
The other 3 locations will be hardwired. The collected data will be
used to track vehicles along the system which ultimately result in
mileage calculations to be used by maintenance and OCC. |
|
12/2004 |
Cleveland Electric |
AC Track
Circuit Replacement |
MARTA- B&C is
responsible for design and procurement of equipment for replacing AC
track circuits. B&C is also responsible for modifications of
existing TC rooms, field testing and cutovers. |
|
12/2004 |
WMATA |
Ground
Detector Replacement |
B&C is currently
designing and installing new AC & DC ground detectors to replace
outdated ground detectors. |
|
03/2004 |
SF MUNI |
Wayside
cases |
Design, furnish,
startup, and test wayside cases to control freight rail, light rail
and drawbridge. |
|
03/2004 |
SF PORT
Authority |
Cantilever Drawbridge |
Design, furnish, startup,
and test wayside cases to control freight trains and new Cantilver
drawbridge over the Islais Channel for the Port of San Francisco. |
| ON GOING |
US&S |
NYCTA ATS Project |
B&C Transit provided
all personnel to supervise installation, conduct field surveys, make
all field design modifications, and perform all commissioning for
Union Switch & Signal, Inc. |
COMPLETED PROJECTS
|
Completion Date |
Client
Name |
Project
Name |
Project
Description |
| 06/2005 |
MARTA |
Avondale & Amour Yards |
B&C Transit is
designing, furnishing, and installing a computer based control
center for both yards. Systems consist of 4 UNIX redundant hot
failover servers, 13 workstations and printers, 8 LCD overview
monitors, and 8 video servers over T1 and fiber optic LAN. |
| 9/2004 |
SAC RT |
GPS
Tracking |
Completed a 5 monitor
stand alone system with graphical representations of the entire
Sacramento Light Rail system. The system retrieves GPS latitude,
Longitude, Direction, and Speed of rail cars and maps them on the
track displays as they move throughout the transit line. This system
integrates with a Microsoft SQL database residing on the IT servers. |
| 5/2003 |
BART |
SORS |
Sequential Occupancy
Detection System. B&C Transit completed office systems for 24
locations to detect occupancies from MUX inputs and shadow trains
with pseudo occupancy (rear end protection) using dynamic logic
within redundant system servers at each TCR location. SORS computers
integrate with Allen-Bradley PLC's and send all information to the
Central mainframes at BART Central via BARTNET (Ethernet IP) for
display on on all BART graphical mainline systems. |
| 12/2002 |
BART |
Airport
Extension |
San Francisco Airport
Extension Project: B&C Transit provided all personnel required to
manage the overall systems integration for Amelco Electric, Inc. as
well as integration of a new Bombardier Gealoc systems into an
existing Alstom VPI system. B&C also provided the design and
software for 6 fully controllable remote access terminals for the ATC system. |
| 12/2/2002 |
BART |
Daly City
Yard |
Daly City Yard Lead
Modification Project. B&C Transit provided all design (new and
modifications), documentation, project management, and field-testing
required to make all modification required to the Daly City Yard. |
| 7/2/2002 |
BART |
Hayward
Yard |
Hayward Yard Track
Improvements. B&C Transit provided all design (new and
modifications), documentation, project management, and field-testing
required to the Hayward Yard. |
| 6/2001 |
BART |
Concord
yard Expansion |
B&C Transit provide
all design, documentation, project management, and field-testing
required to the Concord Yard. |
|
8/2001 |
US&S |
NYCTA 63rd Street
Rehab Project |
B&C Transit provided all
personnel to supervise installation, conduct field surveys, make all
field design modifications, and perform all commissioning testing
for US&S Inc. |
|
12/2003 |
US&S |
DART Expansion Project |
B&C Developed a conversion
tool to allow Boolean expressions to be converted to Ladder Logic
graphics and vice-versa for Union Switch & Signal vital and
non-vital processors. |
|
12/2000 |
US&S |
MARTA Extension |
B&C provided all
engineering services (design and commissioning) for the
modifications to the Alstom vital and non-vital processors. |
| 11/2000 |
ALSTOM |
WMATA
F-Line Extension |
B&C provided all field
personnel required to commission the WMATA F-Line for Alstom
Signaling. |
| 12/1/1999 |
ALSTOM |
Taipei Blue
Line |
B&C provided all field
personnel required to commission the Taipei Blue Line for Alstom
Signaling. |
|
6/1/1999 |
ALSTOM |
NYCTA Seabeach Line |
B&C
provided all field personnel required to commission the Seabeach
Line for Alstom Signaling. |
| 12/1998 |
BART |
DPX & CPX |
B&C provided a
resident engineer required to commission BART's DPX and CPX
extensions for Alstom Signaling Los Angeles MTA. |
|